Masdar is a clean energy company which owend by
Mubadala which given responsibility to
achieve UAE goal and considered in building US$200 million
wind farm near KSA border, Abu Dhabi is committed to producing 7%of its power
from natural resources by 2020.
The Arabian Gulf is not a windy
place what makes the experts to make specialised blades to generate more energy
from sun light. Masdar in early stages will introduce 100mw.
Since the there are not much wind
in UAE and the goal is to develop in the GCC than solar power.
For this operation it will cost 2
million dollar to install every mw of wind the goal is at least to 200million
to build according masdar estimating.